Survive Craft Walkthrough Raft


1.0.0 by soeram's project
Mar 27, 2023

About Survive Craft Walkthrough

Watch out, be careful, there are sharks here

There is 1 survivor of a terrible plane crash and stranded in a place without civilization in the middle of the sea surrounded by ferocious and hungry sharks. How will he survive?

The survival simulator game on the raft will take you on an epic adventure in the middle of the ocean! The main goal of the game is to survive as long as possible, and for this you need to craft various resources and buildings - gather resources, repair rafts and build shelters right on top of rafts where hunger and thirst are also not to be trifled with. Hungry and ferocious hui attack can ruin your survival plan on raft.

Guide to playing this simulator teaches many things

🦈 Survival Simulator, Watch for health, hunger and thirst indicators.

🦈 Survival mode with catch fish, grow vegetables and get water

🦈 How to craft building materials, clothing, weapons, chests and more necessary for survival.

🦈How to explore the islands by traveling to the islands and discovering new lands

🦈 How to get the necessary resources from debris, algae, boxes and more.

🦈 Crafting and building a real shelter that will allow you to last as long as possible

🦈 And many more, make sure you learn them all and win against these vicious huis

Disclaimer

This application is not a game application, this is just a guide and not an official application from the game developer, this is made by fans to simply share experiences. This is only a guide.

Additional APP Information

Latest Version

1.0.0

Uploaded by

Phan Jackson

Requires Android

Android 4.4+

Report

Flag as inappropriate

Show More

Use APKPure App

Get Survive Craft Walkthrough old version APK for Android

Download

Use APKPure App

Get Survive Craft Walkthrough old version APK for Android

Download

Survive Craft Walkthrough Alternative

Get more from soeram's project

Discover